Two Post Car Parking Lift
Description
Two Post parking lift are hydraulic unit driven lift which has Two mounting posts. Platform design has been made in compact way to stack the vehicle with the minimum space. This parking system is designed of two spaces of up and down as one unit. The bottom car can go in and out directly. When the upper space needs to park a car, the car in the bottom should be driven out.It is the most economical solutions to stack vehicle in vertical position. And easy to operate with low noise production.
Characteristics
Hydraulic driven and chain balance system.
Two stage dual-cylinder lifting.
Automatic lock & electric Lock release
Anti-falling mechanical locks (8 holes) at different heights to ensure safety.
Operation control box (UP, DOWN & EMERGENCY).
High polymer polyethylene slide blocks, wear-resistance. Suitable for commercial and residential use.
Space saving, possibility to share posts for multiple connected units. Steel parts are sandblasted then anti-corrosion primer painted and top finish color coated
Product parameters
Mode of drive
|
Hydraulic
|
Outer size
|
≤5700mm*2800mm*3640mm
|
Power
|
2.2kw
|
Car size
|
5000mm*1850mm*1550mm
|
Car weight
|
≤2000kg
|
Time
|
35s
|
Noise
|
≤65db
|
Parking way
|
Upper/Grounding:Both forwarding and reversing
|
Advantages
1. First safety control with protective devices
1) Anti-dropping device: to prevent the vehicle loading pallet from undesired disconnection.
2) Limited switch device to protect the equipment running.
3) Photoelectric switch (device for checking the entrance of people and vehicles) to prevent the people from accidentally entering into the equipment under operation.
4) Emergency switch: the emergency switch button is used to cut power off when there is anything abnormal during the equipment process.
2. Oil cylinder
Used cylinder reversal, have many advantages, not distortion, dustproof. Adopt Italy Aston Seal ring.
3. Adjusting lifting height, the maximum lifting height can be 1800mm for small SUV.
4. Lifting capacity can be 2300kgs;
5. Hydraulic drive, chain balancing device to ensure the balance both ends of rise and fall;
6. Low noise, smooth operation, save energy, low carbon and environmental protection;
7. Vehicle loading pallet fully enclosed design, to avoid oil leakage, rain and snow polluting the lower vehicles;
8. Structure all adopts layer cutting, attractive appearance, easy installation, less malfunctions, easy maintenance.
9. Plastic spraying high quality coating, high anti-corrosion ability, long life. Electrical and driving parts with waterproof characteristics;
10. Simple structure, easy installation, minimal requirements for civil engineering;
11. Certifications: CE
FAQ
Q: Are you a factory or trading company?
A: Changyue Parking is a factory with more than 20 years’manufacturing design experience. We can offer you the most favourable price and provide you the quick feedback after-sale service.
Q: What is the warranty term of your product?
A: The warranty term of our product is 12 months. Within warranty, if there is any quality defect, we will send you the new parts and dispatch our engineer to solve it.
Q: How to make the installation? Can you send engineer to us?
A: First we will send you all the technical documents, such as foundation drawing, installation manual, operation manual. If you have professional engineer, you can finish it by yourself.
Second, If you’re new for the car parking system, We can dispatch our engineer to guide the installation, the cost will belong to the buyer.
Q: How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q: What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q: How to repair and maintain the product?
A: You don't need too much maintenance because our products all use big brand electric devices and we pay more attention on quality, the whole system can work well in long time. If necessary, we suggest that small parts are maintained once a week, the large parts are maintained once a month.
Q: If the failures of parking equipment happened from customers which are not in the warranty period, how does the company deal with it?
A: First, we would provide some spare parts when the parking system ship out. If any parts need to be replaced in the maintainence work. We will check and help to slove problems by remote operation.
Second, if other parts are dameaged, we will replace them by remote operation upon agreement between both sides. If it is necessary to dispatch our engineers to the site, all the cost occurred will belong to the buyer.